{"id":1966,"date":"2018-08-28T00:00:00","date_gmt":"2018-08-28T00:00:00","guid":{"rendered":"https:\/\/www.mtsu.edu\/blogtest\/construction-parking-transportation-update\/"},"modified":"2025-03-27T17:19:35","modified_gmt":"2025-03-27T17:19:35","slug":"construction-parking-transportation-update","status":"publish","type":"post","link":"https:\/\/www.mtsu.edu\/president\/construction-parking-transportation-update\/","title":{"rendered":"Construction \/ Parking \/ Transportation Update"},"content":{"rendered":"<div style=\"margin-top: 0px; margin-bottom: 20px;\" class=\"sharethis-inline-share-buttons\" ><\/div><div class=\"page\" title=\"Page 10\">\n<div class=\"layoutArea\">\n<div class=\"column\">\n<p>Numerous campus construction projects are ongoing or were recently completed. Here is a brief update on those recent and current projects:<\/p>\n<div class=\"page\" title=\"Page 10\">\n<div class=\"layoutArea\">\n<div class=\"column\">\n<p><strong>Middle Tennessee Boulevard<\/strong><\/p>\n<p><em>Currently under construction <\/em><\/p>\n<p>Scope of work:<\/p>\n<ul>\n<li>Widening 0.8-mile section of Middle Tennessee Boulevard between East Main and Greenland to a divided four-lane street<\/li>\n<li>Landscaped median with dedicated turn lanes<\/li>\n<li>Improved pedestrian walks and crossings<\/li>\n<li>Bike lanes<\/li>\n<li>Improved lighting<\/li>\n<li>New underground utilities<\/li>\n<li>Monument entry walls to\u00a0MTSU campus<\/li>\n<li>New drop-off at Murphy Center<\/li>\n<li>Improvements to the Faulkinberry\u00a0Drive intersection<\/li>\n<\/ul>\n<p><em>Completion expected in December<\/em><\/p>\n<div class=\"page\" title=\"Page 10\">\n<div class=\"layoutArea\">\n<div class=\"column\">\n<p><strong>Academic Classroom Building<\/strong><\/p>\n<ul>\n<li>New center for the College of Behavioral and Health Sciences<\/li>\n<li>Consolidating of functional areas to the Criminal Justice Administration, Psychology, and Social Work departments<\/li>\n<li>Critically needed classrooms, offices, and lab spaces provided<\/li>\n<li>State funding received July 13<\/li>\n<li>$39.6 million total project cost<\/li>\n<li>91,000 square feet\u00a0Building site located north\u00a0of the Student Union across<\/li>\n<\/ul>\n<\/div>\n<\/div>\n<\/div>\n<div class=\"page\" title=\"Page 10\">\n<div class=\"layoutArea\">\n<div class=\"column\">\n<p><strong>MTSU Boulevard<\/strong><br \/>\n\u2022 Sitework construction (site utilities\u00a0and grading) starting late August; project completion expected summer 2020<\/p>\n<p>\u2022 Building project manager: Turner Construction Co.<\/p>\n<p>\u2022 Project architect: Bauer Askew Architecture<\/p>\n<div class=\"page\" title=\"Page 10\">\n<div class=\"layoutArea\">\n<div class=\"column\">\n<p><strong>Parking Services Facility<\/strong><\/p>\n<p>\u2022 New home for Parking Services, including parking permits, bus maintenance, and personnel offices<\/p>\n<p>\u2022 Design phase completed<\/p>\n<p>\u2022Bids opened Aug. 22<\/p>\n<p>\u2022 Construction starting this fall and\u00a0finishing in winter 2019<\/p>\n<p>\u2022 Located on City View Drive<\/p>\n<p>\u2022 $3.4 million total project cost<\/p>\n<p>\u2022 13,000-square-foot building area<\/p>\n<p><strong>Parking and Transportation Improvements<\/strong><\/p>\n<ul>\n<li>$1.580 million construction cost<\/li>\n<li>New surface and lighting at\u00a0Greenland Drive parking lot<\/li>\n<li>New sidewalks and lighting\u00a0along Alumni Drive and Military\u00a0Memorial Drive<\/li>\n<li>Improved pedestrian access to\u00a0Livestock Lot and new lighting<\/li>\n<li>Wider sidewalks along Founders Lane<\/li>\n<li>Currently under construction, with\u00a0completion this fall<\/li>\n<li>Small roundabout at Military\u00a0Memorial and Champion Way<\/li>\n<\/ul>\n<div class=\"page\" title=\"Page 10\">\n<div class=\"layoutArea\">\n<div class=\"column\">\n<p><strong>Peck Hall Renovations<\/strong><\/p>\n<ul>\n<li>$924,000 construction cost<\/li>\n<li>Interior improvements, including\u00a0new lighting at corridors and refinishing of terrazzo flooring on second and third levels<\/li>\n<li>New ceiling and lighting at breezeways<\/li>\n<li>New furnishings for courtyard areas<\/li>\n<li>Project completion this fall<\/li>\n<\/ul>\n<div class=\"page\" title=\"Page 10\">\n<div class=\"layoutArea\">\n<div class=\"column\">\n<p><strong>Dining<\/strong><\/p>\n<p>Changes are occurring in the Student Union. We are replacing the Dippers venue and installing a \u201crestaurant rotation\u201d concept. Rotation options will include:<\/p>\n<p>\u2022 Barbeque District (Texas BBQ) \u2022 BibimBox (Korean food)<\/p>\n<p>\u2022 Medi-Eats (Mediterranean-inspired cuisine)<\/p>\n<p>\u2022 Noodle Fix (global noodle dishes)<\/p>\n<p>\u2022 O-mori Ramen Bar (build-your-own\u00a0Ramen dish)<\/p>\n<p>\u2022 Road Trip America (regional\u00a0American cuisine, such as\u00a0New England classics)<\/p>\n<p>\u2022 Taco del Seoul (Korean flavors\u00a0and Mexican fusion)<\/p>\n<p>\u2022 Zoca (Mexican fare)<\/p>\n<p>We also will begin offering breakfast at Steak \u2019n Shake this fall. Breakfast options include biscuit sandwiches, breakfast tacos, Royale Steakburger, and Country Breakfast Bowl.<\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Numerous campus construction projects are ongoing or were recently completed. Here is a brief update on those recent and current projects: Middle Tennessee Boulevard Currently under construction Scope of work: Widening 0.8-mile section of Middle Tennessee Boulevard between East Main and Greenland to a divided four-lane street Landscaped median with dedicated turn lanes Improved pedestrian [&hellip;]<\/p>\n","protected":false},"author":8,"featured_media":310,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-1966","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized"],"_links":{"self":[{"href":"https:\/\/www.mtsu.edu\/president\/wp-json\/wp\/v2\/posts\/1966","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.mtsu.edu\/president\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.mtsu.edu\/president\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.mtsu.edu\/president\/wp-json\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/www.mtsu.edu\/president\/wp-json\/wp\/v2\/comments?post=1966"}],"version-history":[{"count":0,"href":"https:\/\/www.mtsu.edu\/president\/wp-json\/wp\/v2\/posts\/1966\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.mtsu.edu\/president\/wp-json\/wp\/v2\/media\/310"}],"wp:attachment":[{"href":"https:\/\/www.mtsu.edu\/president\/wp-json\/wp\/v2\/media?parent=1966"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.mtsu.edu\/president\/wp-json\/wp\/v2\/categories?post=1966"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.mtsu.edu\/president\/wp-json\/wp\/v2\/tags?post=1966"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}